-
Nipples Ottone MM 3/8"
1,566 €
-
MANICOTTO INTERMEDIO POLIETILENE 63
17,526 €
-
SERBATOIO PANETTONE - PAN NEW 5000 T.A (TELCOM)
2.199,468 €
-
ROSONE 1/2" CROMATO
0,415 €
-
PIANO NEUTRO 300X20
668,594 €
-
BARILOTTO OTTONE DA 1/2 cm. 15
10,183 €
-
PIANO VERDE 150X200
334,297 €
-
CURVA PP MM. 110 A 15°
4,963 €
-
MOLTIPLICATORE 2PR 16A IP44 230V
44,024 €
-
MANICOTTO INTERMEDIO POLIETILENE 50
12,540 €
-
Gomito MF 1" 1/2 ottone
19,356 €
-
Gomito FF 1" 1/2 ottone
18,643 €
-
Gomito FF 1" ottone
8,253 €
-
FX 80 KG 25
0,401 €
-
SMER.ANG.G18DSL2 115MM 18V BSTK (HIKOKI)
326,175 €
-
RETE PACCIAMATURA H.200 X 100M VERDE
300,918 €
-
TUBO INOX CM 100 SP.0,5 D.80
19,519 €
-
Gomito MF 1/2" ottone
3,348 €
-
CURVA PP MM. 90 A 67°
4,897 €
-
CURVA PP MM. 40 A 87°
1,289 €
-
CURVA PP MM. 50 A 87°
1,578 €
-
NX 120 CALCE KG 25
0,315 €
-
ONDULATO VERDE 200X20
445,729 €
-
CURVA PP MM. 90 A 45°
4,442 €
-
FRATTAZZO SPUGNA ROSSA 40X7 (BAUMAT)
11,839 €
-
ONDULATO VERDE 100X20
222,865 €
-
Tappi Prova Impianto Rosso
0,610 €
-
FRATTONE A/L 48X13X07 INOX (BAUMAT)
40,839 €
-
CONTROTELAIO DOPPIO X SCORREV.120
608,536 €
-
CURVA PP MM. 32 A 87°
1,850 €
-
RACCORDO POLIETILENE M 1" 32
2,818 €
-
Nipples Ottone MM 1/2"
1,423 €
-
TUBO MATERIALE G BETONE /40 ML 5
170,132 €
-
SMANICATO REGALO
0,000 €
-
CAPPELLINO REGALO
0,000 €
Total:6.868,037 €
CONDIZIONI GENERALI




















































